France Regeneration Technology

  •  
  •  
  • France regeneration, pumping 20 'after regeneration Few if any technical advances have been made in a long time in the field of water well / borehole drilling, on the other hand in the field of maintenance, regeneration and development for water boreholes and wells for drinking water for geothermal  and for mineral water, we at FRT are at the forefront of research in Europe and we utilise the most appropriate and sustainable technologies which are the watergun and the airgun. Indeed, no other technique obtains as good results with a very light implementation and a very short time of realization!
  •  
  • Advantage :

  •  
  • France regeneration response vehicle No chemical used
  • Speed of Operation; 4 hours for a 100 meter borehole!
  • Borehole or well can be Immediately put back in service.
  • Minor operating loss of time and cost.
  • It is usually possible to continue operating other boreholes over 20m away in the same field.
  • All types of boreholes or wells can be treated ; vertical, horizontal, radiant drains, barbicans, Cuaus, mines, etc
  • Lower cost than with an acidification.
  • The only system which works in implosion, and therefore which brings the fine sands and biological materials from deep withing the pack and aquifer and deposits them in the bottom of the borehole or mobilises them to be freed during clearance pumping.
  • Complete destruction of the bio film behind the gravel pack.
  • Much better gains in yield than with all other systems
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •